ravenscape
24th August 2006, 01:14 PM
Here are the current To Be Considered Lists with their status. I will update this thread as the status changes (roughly twice a month), so that you can tell at a glance what's going on.
To Be Considered List being collected:
August 15 (http://www.christianforums.com/t5524843--june-1-thru-august-1-to-be-considered-lists-.html)
To Be Considered List(s) awaiting review:
January1-15
February 1-15
March 1-15 (http://www.christianforums.com/t5795768-january-march-to-be-considered-lists.html)
April 1-15
May 1-15 (http://www.christianforums.com/t5795802-april-may-to-be-considered-lists.html)
June 1-15
July 1-15
August 1 (http://www.christianforums.com/t5524843--june-1-thru-august-1-to-be-considered-lists-.html)
To Be Considered List(s) being worked, with designs in progress or ready to start:
November 15(finishing up)
December 1(finishing up)
December 15
(http://www.christianforums.com/t5795708-november-december-2006-to-be-considered-lists.html) In addition, we are working on several redesigns of items that were originally based on pictures from Doll sites or other pictures that are copyright protected. Most if not all of the original designs may violate copyright. We've completed about 40 redesigns, and have about 5 more to go -- Update - I believe we only have one questionable design left to replace. This one is *probably* ok, but we're making some modifications, because better to be safe than sorry.
This is a high level look at the status of design requests that members make. I will update this thread as things change. I hope that between this thread and the "To Be Considered" List threads, people will know (or can find out) things like:
Is my request still under consideration?
About how much longer (roughly) will the wait be?
What is the status of other requests that I am interested in?First, let me explain the process a little bit. We use a bimonthly schedule here in the armory, and each half-month period is called a "go-round".
When a person makes a request, it is acknowledged and added to the "to be considered" list for that go-round.
Once the go-round ends (on the 15th and 1st of each month), the "To Be Considered" list is finalized and a new list is started.
Meanwhile, the design team is making designs for requests on prior "To Be Considered" lists that have been reviewed.
The To Be Considered lists are not reviewed the day after the go-round ends. We don't review a new list until we've just about completed the list of requests that are currently being designed.
So, at any given time we have one list of requests that are being collected, one or more lists waiting to be reviewed, and one or more lists that have been reviewed and are being worked on.
To Be Considered List being collected:
August 15 (http://www.christianforums.com/t5524843--june-1-thru-august-1-to-be-considered-lists-.html)
To Be Considered List(s) awaiting review:
January1-15
February 1-15
March 1-15 (http://www.christianforums.com/t5795768-january-march-to-be-considered-lists.html)
April 1-15
May 1-15 (http://www.christianforums.com/t5795802-april-may-to-be-considered-lists.html)
June 1-15
July 1-15
August 1 (http://www.christianforums.com/t5524843--june-1-thru-august-1-to-be-considered-lists-.html)
To Be Considered List(s) being worked, with designs in progress or ready to start:
November 15(finishing up)
December 1(finishing up)
December 15
(http://www.christianforums.com/t5795708-november-december-2006-to-be-considered-lists.html) In addition, we are working on several redesigns of items that were originally based on pictures from Doll sites or other pictures that are copyright protected. Most if not all of the original designs may violate copyright. We've completed about 40 redesigns, and have about 5 more to go -- Update - I believe we only have one questionable design left to replace. This one is *probably* ok, but we're making some modifications, because better to be safe than sorry.
This is a high level look at the status of design requests that members make. I will update this thread as things change. I hope that between this thread and the "To Be Considered" List threads, people will know (or can find out) things like:
Is my request still under consideration?
About how much longer (roughly) will the wait be?
What is the status of other requests that I am interested in?First, let me explain the process a little bit. We use a bimonthly schedule here in the armory, and each half-month period is called a "go-round".
When a person makes a request, it is acknowledged and added to the "to be considered" list for that go-round.
Once the go-round ends (on the 15th and 1st of each month), the "To Be Considered" list is finalized and a new list is started.
Meanwhile, the design team is making designs for requests on prior "To Be Considered" lists that have been reviewed.
The To Be Considered lists are not reviewed the day after the go-round ends. We don't review a new list until we've just about completed the list of requests that are currently being designed.
So, at any given time we have one list of requests that are being collected, one or more lists waiting to be reviewed, and one or more lists that have been reviewed and are being worked on.